Wednesday, 14 June 2017

FYP PROGRESS 2 - WEEK 15

Title of activity

-   Final Year Project Presentation

Objective

1. To fulfill the FYP requirement

2. To present and show the project to student and lecturer.

Content






Thursday, 8 June 2017

FYP PROGRESS 2 - WEEK 14

Title of activity

-  Finalize the project development and print the project's poster

Objective

1.  Preparation for presentation (industrial day)


Content



Friday, 26 May 2017

FYP PROGRESS 2 - WEEK 13

Title of activity

-  FYP poster design and draft chapter 1,2 and 3 submission

Objective

- The fyp poster was design
- The draft was submit to dr. marwangi (fyp comittee)

Content

The poster were design using microsoft publisher softwarew

Friday, 19 May 2017

FYP PROGRESS 2 - WEEK 12

Title of activity

- Project wiring and refining 

Objective

- To make project's wiring neat and good, and the project were improve in landscape and structure of the train model

Content






Thursday, 11 May 2017

FYP PROGRESS 2 - WEEK 11

Title of activity

-  Result of the project

Objective

- Produce a table result for 3 main part of the project

Content

SENSOR
Obstacle
Distance <= 5cm
Obstacle
Distance >= 5cm
ULTRASONIC
RELAY ON
RELAY OFF
Table 1 Ultrasonic range distance’s result

SENSOR
Light
sensitivity <= 700
Light
sensitivity >= 700
PHOTORESISTOR
LED OFF
LED ON
Table 2 Photoresistor light sensitivity’s result

SENSOR
 Servo Motor 1
Servo Motor 2
Servo Motor 3
Servo Motor 4
INFRARED A
(ON)
Servo rotate to
90°
Servo rotate to
90°
Servo rotate to
180°
Servo rotate to
180°
INFRARED B
(ON)
Servo rotate to
180°
Servo rotate to
180°
Servo rotate to
90°
Servo rotate to
90°

Table 3 Infrared sensor working function’s result

Friday, 5 May 2017

FYP PROGRESS 2 - WEEK 10

Title of activity

-   Code test and error and the development of light detection system

Objective

1.  Finalize and play with the project code for automatic gate control and obstacle avoidance system

2. Develop the light detection system.

Content







 Code test and develop for better result




Light detection system development

Sunday, 30 April 2017

FYP PROGRESS 2 - WEEK 9

Title of activity

-   Assemble automatic gate control system on project board

Objective

1.  Start build the project

2.  Build the electric train traction overhead line.

Content





Servo motor will open and closed as the train detected by the infrared sensor. the arduino onboard of the train will turned on when the voltage flow from the overhead line through the it and flow into arduino which will make the ultrasonic function and relay function